Safety SolutionsGroup

Stadium · Baku

Baku Olympic Stadium: water mist and FM-200 fire suppression

Baku Olympic Stadium opened in March 2015 ahead of the first European Games: a six-level, 60-metre structure by Lake Boyukshor with more than 68,000 seats, the largest stadium in the country. We took part in installing its water mist and FM-200 suppression systems and maintain both today.

Site
Baku Olympic Stadium
Status
Under service
Systems
Water mist + FM-200
Scope
Installation · service
Baku Olympic Stadium

About the work

Scope of work

Where tens of thousands of people gather at once, a suppression system must be both effective and safe for people. Water mist was chosen for the public areas: fine droplets discharged at high pressure cool the flame and displace oxygen, using a fraction of the water of conventional sprinklers and causing far less damage. In the technical and electrical rooms, where equipment is concentrated, FM-200 gas suppression was installed.

The stadium was built to UEFA and FIFA standards and hosts international events, so system readiness is tied to the match and event calendar. Periodic service covers the pump station and water mist lines, FM-200 cylinder pressure, detectors and control panels, with test results documented.

If a fault occurs our team attends on call and returns the system to service. Maintenance on both systems continues. If you are planning suppression for a sports, concert or exhibition venue, send the design and we will propose the system type and the calculation.

Contact

A quote for a large venue

Suppression system calculation for a stadium, arena or public building: send the design.

Baku office

Baku, Narimanov district, Ağa Nemətulla str. 247

+994 50 453 33 45 · info@safetysolutions.az

Mon–Fri 09:00–18:00 · emergencies 24/7

Send a request

Your details are used only to answer your request.

CallWhatsApp